Quantitative Reasoning Speed And Work Test Online

Speed And Work Test Online

Total Questions: 50
Time Allowed: 25 Minutes
Total Marks: 50
How to Attempt Test: Please choose the right Option in MCQ-type question.
Test Helpful For: Aptitude Test
Forces Test
Quantitative Reasoning Test
Interview Questions Answer
Recruitment Tests

Quantitative Reasoning Speed And Work Practice Test Online

 0%

Page 1 of 2

1. Two taps can fill a cistern in 20 and 30 minutes respectively. A waste pipe can empty it in 60 minutes. If all are opened together, tank will be filled in?

2. If 15 men can reap a field in 6 days, then 9 men will reap it in?

3. A train 150 m long passes a man walking at 6 km/h in same direction in 15 sec. Speed of train?

4. A can build a wall in 40 days. B is twice as fast as A. Together they can complete the wall in?

5. A can complete a work in 30 days. He works for 5 days and leaves. The remaining work is completed by B in 20 days. How long would B take alone?

6. A boat goes 16 km downstream in 2 hours and returns in 4 hours. Speed of boat in still water is?

7. If A and B can finish a work in 10 days, B and C in 12 days, and A and C in 15 days, then A, B, and C together can finish the work in?

8. A can complete work in 18 days, B in 24 days. They worked together for 6 days, then B left. Remaining work was completed by A in?

9. A can do a work in 10 days, B in 20 days. They work together for 4 days, then A leaves. Remaining work will be finished by B in?

10. A does a piece of work in 20 days and B in 30 days. They work together for 5 days, then B leaves. Remaining work will be finished by A in?

11. A car travels from P to Q at 60 km/h and returns at 40 km/h. Average speed of the car?

12. A train running at 72 km/h crosses a platform 180 m long in 15 seconds. The length of the train is?

13. If 8 men can build a wall in 20 days, how many men are needed to build it in 10 days?

14. A can complete a work in 25 days. B can do it in 50 days. They start together but A leaves after 5 days. The remaining work will be finished by B in?

15. If 12 men can complete a job in 8 days, then how many men are required to complete it in 6 days?

16. A and B together can do a work in 12 days. B alone can do it in 30 days. A alone can do it in?

17. A and B can complete a work in 8 and 12 days respectively. They work together for 4 days. Remaining work will be completed by B in?

18. A train 90 m long crosses a platform 150 m long in 12 seconds. Speed of the train is?

19. A and B can finish a work in 15 days and 20 days respectively. They start together but after 4 days A leaves. Remaining work will be finished by B in?

20. A and B can finish a piece of work in 20 days. They start together but after 8 days A leaves. B alone will finish the remaining in 30 days. How long will A take alone?

21. A can finish a work in 10 days and B in 15 days. If they work on alternate days starting with A, the work will be completed in?

22. A train 120 m long crosses a bridge 180 m long in 12 sec. Speed of train is?

23. If A completes a work in 15 days and B in 25 days, then both together in?

24. A can do a job in 15 days. B is 50% more efficient than A. In how many days B will finish it?

25. A train 180 m long passes a pole in 9 seconds. Its speed is?


 

Malik Tahir

Greetings, learners! I'm Tarry Malik, your guide to conquering the world of Exams prep and Online studies. Let's navigate the textbooks together, share study hacks, and make your educational journey a breeze.

3 Comments

  1. question 2 and 3 both wrong in qestion 2 7.5 should be radius instead of circumference to make ans 132 and question 3 correct ans is 84 minutes( 1 hour 22 minutes) which is not in the answer sheet

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button